Parr-instrument PDM Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Capteurs Parr-instrument PDM. Parr Instrument PDM User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Installation Instructions for
Pressure Display Module (PDM)
556M
Meter Installation in 4848 Reactor
Controller
1. Unplug the power cord of the 4848 controller.
Remove the (2) screws located on the top/front
cover at the rear corners of the controller. Gen-
tly lift the cover forward, which is hinged at the
bottom, taking care not to apply tension on any
internal wiring.
2. If applicable, remove and discard the black hole
plug on the sloped front panel above the “PRES-
SURE” text. This can be done by pinching the
clasps on the back of the plug from the inside of
the front plate.
3. Insert the PDM (2082E) through the panel cutout,
from outside in, making sure the rubber gasket
is on the outside of the controller front panel.
(If wires are preinstalled, remove the terminal
connector by releasing the tabs on the sides of
the module and gently pulling the terminal con-
nector off. Reference photos below.) Slide the
white mounting bracket onto the module with
the mounting screws pointing towards the front
panel. Slide the mounting bracket forward until
it touches the controller panel. The clasps on the
mounting bracket should align with the groves
on the module. Gently tighten the screws until
the module is held into place. (If removed, reat-
tach the terminal connector.)
Terminal Connector Removal
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1 - Pressure Display Module (PDM)

Installation Instructions for Pressure Display Module (PDM)556MMeter Installation in 4848 Reactor Controller1. Unplug the power cord of the 4848 cont

Page 2 - PDM Installation

PDM InstallationParr Instrument Company2Meter Installation in 4848 Reactor Controller (Continued)Meter Installation Diagram

Page 3

PDM Installationwww.parrinst.com37 8 9 10 11 121 2 3 4 5 62082E Pin Out(Pin 5 is blank)6. Take the black and white cable, with both ends stripped, fr

Page 4

PDM InstallationParr Instrument Company4Wiring Installation in 4848 Reactor Controller (Continued)9. Find the free orange wire #1 from the kit and at

Page 5

PDM Installationwww.parrinst.com5PDM Wiring Schematic2082E/1212STRIP .23BLACK#112082E/75-WHITE +STRIP .2319LOC1NO.WIRE4+BLUE13STRIP .35END#2LOCWHIT

Page 6

PDM InstallationParr Instrument Company6A2104E Harness Wiring Schematic

Page 7

PDM Installationwww.parrinst.com7Factory Default SettingsPressure ModuleKeys command:1. Press “SET” to select 2. Press return key move to next opera

Commentaires sur ces manuels

Pas de commentaire