Parr-instrument Primary Temp Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Capteurs Parr-instrument Primary Temp. Parr Instrument Primary Temp User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
- 1 -
Back of Primary Temperature Meter
Back of Primary Temperature Meter
Meter installation in 4838 Reactor Controller
1. Unplug the power cord of the 4838 controller. Remove the (2) screws located on
the top corners of the rear panel on the controller. Gently lift the cover, which is
hinged at the bottom, forward taking care not to apply tension on any wiring
internally.
2. Make a note of where the wires are
installed on the existing primary
temperature meter. The pin numbers are
printed on the back of the meter itself.
They should match the Pin Out table on
the next page. Using tape to designate
each wire, record the pin number each
wire is attached to.
3. Using a Phillips screwdriver, remove the
wires from the back of the primary
temperature meter.
4. Using a Phillips screwdriver, remove the two screws on the top and bottom
mounting brackets. Pull the meter out.
5. Insert the new meter through the panel cutout, from outside in, making sure the
rubber gasket is on the outside of the
controller front panel. Slide the mounting
brackets onto the meter with the mounting
screws pointing towards the front panel.
Slide the mounting bracket forward until it
touches the controller panel. The clasps
on the mounting brackets should align
with the grooves on the meter. Gently
tighten the screws until the meter is held
into place.
6. Connect the free wires (disconnected in
step 3) to the new meter. Check the positions carefully and refer to the Pin Out
table.
I
I
I
n
n
n
s
s
s
t
t
t
a
a
a
l
l
l
l
l
l
a
a
a
t
t
t
i
i
i
o
o
o
n
n
n
I
I
I
n
n
n
s
s
s
t
t
t
r
r
r
u
u
u
c
c
c
t
t
t
i
i
i
o
o
o
n
n
n
s
s
s
f
f
f
o
o
o
r
r
r
P
P
P
r
r
r
i
i
i
m
m
m
a
a
a
r
r
r
y
y
y
T
T
T
e
e
e
m
m
m
p
p
p
e
e
e
r
r
r
a
a
a
t
t
t
u
u
u
r
r
r
e
e
e
M
M
M
e
e
e
t
t
t
e
e
e
r
r
r
i
i
i
n
n
n
4
4
4
8
8
8
3
3
3
8
8
8
C
C
C
o
o
o
n
n
n
t
t
t
r
r
r
o
o
o
l
l
l
l
l
l
e
e
e
r
r
r
No. 561M
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1 - No. 561M

- 1 - Back of Primary Temperature Meter Back of Primary Temperature Meter Meter installation in 4838 Reactor Controller 1. Unplug the power cord o

Page 2

- 2 - PTM Installation in a 4838 Pin Out Table: 2083E Meter Color: Attaches to: Pin 1 Purple SSR 4/A2- Pin 2 Red SSR +3/A1 Pin 3 Red

Page 3

- 3 - PTM Installation in a 4838 Final Steps: Close the controller and replace the two screws on the back plate. Plug the 4838 Controller back

Page 4

- 4 - PTM Installation in a 4838 Factory Default Settings for Primary Temperature Module Keys command: 1. Press “SET” to select 2. Press retu

Page 5

- 5 - PTM Installation in a 4838 Factory Default Settings for Primary Temperature Module Press “SET” and release Operation Mode Select type/v

Page 6 - PTM Installation in a 4838

- 6 - PTM Installation in a 4838 This page left blank intentionally.

Page 7

- 7 - PTM Installation in a 4838 This page left blank intentionally.

Page 8 - Parr Instrument Company

Revision 07/08/09 Parr Instrument Company 211 53rd Street • Moline, Illinois 61265 USA 1-309-762-7716 • 1-800-872-7720 • Fax: 1-309-762-9453 E-mail

Commentaires sur ces manuels

Pas de commentaire